Constanta wastewater pumping station
Rehabilitation of public wastewater systems in Constanta.
The project
As the population density and number of hotels in Mamaia increased, the existing wastewater systems needed to be rehabilitated to meet the growing city's capacity and technical requirements. Upgrades were essential to keep pace with the city's development.
Partners
The Outcome
In addition to the sewage pumping stations, we are also refurbishing the ventilation systems with stainless steel pipework and the hydraulic system with stainless steel pipework.
This pumping station consists of a building with 6 pumps:
➡️ 3 pumps with a flow rate of 105 l/s, weighing 1,180 kg and an installed power of 122 kW
➡️ 3 with pumps a flow rate of 132 l/s, weighing 600 kg and a power of 46 kW each.